All Shelter
Project Details
Client: All Shelter
Location: Orchard Hills
Completed: 2024
Project Recap: All Shelter, Orchard Hills (2024)
T Sakkal Group was proud to partner with All Shelter on the successful delivery of a new steel shelter structure in Orchard Hills, completed in early 2024. This project saw our team engaged to provide a full-service steel package, covering both fabrication and erection of the steel frame.
With structural reliability and installation efficiency front of mind, we worked closely with the All Shelter team to ensure the frame was fabricated to exact specification, using high-strength materials and precision-cut components. Our in-house fabrication team managed the process from start to finish, ensuring a streamlined workflow and complete quality control at every stage.
Once delivered to site, our rigging and installation crew handled the erection of the shelter with minimal disruption and maximum attention to detail. Working to a tight schedule, we ensured all components were installed safely, securely, and in full compliance with site requirements and engineering standards.
From the outset, this project was about more than just getting the job done—it was about delivering a result that All Shelter could rely on. We’re proud to have played a key role in bringing this new shelter to life and supporting the growth of essential infrastructure in the Orchard Hills region.
Need a steel partner you can trust? Our team is ready to deliver fabrication, transport, and install—all under one roof.